teklif al

BOILER ROOM INSPECTION

BOILER ROOM INSPECTION
Involves subjects such as evaluation of the risk factors to arise on the boiler due to the outer perimeter of the boiler room etc..

Boiler room necessities should be taken into consideration in the course of the boiler room construction and before the stages of boiler installation, manufacturing. Boiler room physical conditions are examined in view of the boiler capacity.

Field of Test:
• Is the boiler room sized in view of the fuel type?
• Is the boiler room arranged in a way there are two doors to the inside and outside?
• Is there an opening in front of, behind and on the right and left side of the boilers that allow all kinds of maintenance, repair and interference?
• Is the clean air necessary in view of the fuel type of the boiler room provided?
• Control of the height of the boiler room,
• Control of the adequacy of the training of the boiler user,
• Adequacy of the measures taken for the safety of the boiler room
 

GERİ

Please register to our newsletter for news and announcements from us, first to be notified.